Achisamakh

  • Client:
    Lod Water Corporation and Landco Israel
  • Architect:
    Malin Engineers, G. Ben Horin Engineering, Syrkin Buchner
  • Main Contractor:
    Malin Engineers, G. Ben Horin Engineering, Syrkin Buchner
  • Period:
    In progress. Completion: 2021
  • Budget:
    NIS 85 million
  • Project Description:

     

    Infrastructure and development project for a residential neighborhood within Achisemech area with a scope of approximately NIS 85 million. The neighborhood is located in the eastern municipal district of the city of Lod alongside Highway 40 which connect it to a system of roads and interchanges that provides rapid access traveling south and north: approx. 10 minutes' drive from Highway 6, approx. 10 minutes to Tel Aviv, and approx. 30 minutes to Jerusalem.

     

    Project Includes:

    • Installation of various wet and dry utilities extending over 15,000 meters
    • Road paving works extending over 260,000 sq.m
    • Earthworks
    • Construction of retaining walls and acoustic barriers
    • Installation of lighting systems
    • Forming new roads and plots
    • Development work

     

    This project represents the continuation of Phase A, which was also carried out by Electra Infrastructure in 2012-2014.